SlaughterPro | HUATAOSearch

Pig Head Hydraulic Shear | HT-P405-I

Pig Head Hydraulic Shear. Compare input range, required output and working interfaces; share your requirements for configuration review.

Pig Head Hydraulic Shear — source product-family photograph; confirm the quoted configuration

Specification notes

ModelHT-P405-I
Rated voltage/Phase/Frequency380V/3P/50HZ
Power3Kw
Blade opening size300mm
Capacity4sec/ time
Component and material1) Balance 2) Hydraulic station 3) Connecting soft pipe
Data statusSource reference R1; configuration requires written confirmation

Use and process role

This Pig Head Hydraulic Shear is specified for one practical job: a powered cutting tool for controlled separation of the pig head or another heavy carcass joint. A reliable installation begins with correct interface dimensions and a realistic duty cycle. The HT listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.

Structure and working principle

Hydraulic pressure closes the blades through the target joint. The operator positions the tool, initiates the cycle and releases it after the cut; the blade set is then cleaned and sterilized before reuse. The upstream machine must not feed faster than the receiving station can clear.

Source-listed construction and features

High cutting force with controlled blade travel

Two-hand or guarded actuation options

Balanced suspension for operator handling

Replaceable blades and seals

Separate sterilization provision

Service access to the hydraulic unit

Applications and integration

The usual application is head removal and heavy cutting stations on medium- and high-throughput pig dressing lines. It can be specified for a new line or adapted to a retrofit, provided that the existing supports, working heights, utilities and control signals are measured on site. Plants handling several pig sizes should state the full range rather than quoting only an average.

Selection conditions and project fit

State incoming product size and temperature, target cut or separation, rate, output specification, interfaces, blade or tool arrangement and guarding requirements. Agree a representative-product trial and the acceptance criteria.

Evidence, configuration and document status

The descriptions and tables below are source-listed reference information, not independently measured results. Confirm material grade, electrical supply, dimensions, duty, guards, controls and delivery scope in the approved quotation and drawing. No model-specific certificate or verified customer installation is established by this page. Request the document issuer, applicable model, scope and revision before relying on a compliance claim.

Source and version

Reference compilation R1, 2026-11-16. Supplied document: 1. 致晕,宰杀,放血 设备 Pig Stunning, Killing and Bleeding Equipment.doc; section 1.14. Configuration rows retain source units. Where the source lists alternatives or several models, each row must be checked as a separate configuration; a capacity or dimension must not be transferred between models.

Installation and process interfaces

Provide product size and condition, target cut or separation, feed/discharge direction, support height and space for tool replacement and maintenance. Confirm the proposed guards, operator access and connection to the receiving station.

Utilities, control and feedback requirements

Check the model-specific drive and electrical or fluid-power supply. Agree start/stop, upstream/downstream interlocks and feedback requirements where relevant. Do not infer a control protocol or tool capability from a family photograph.

Maintenance and part identification

Request the configuration-specific manual and part references for matched blades or tools, drive components, seals and position sensors where fitted. Agree quantities and replenishment needs against actual duty and delivery experience. This page does not prescribe maintenance intervals, repairs or a guaranteed stock position.

Configuration-specific document checklist

Before purchase, identify the complete model and suffix, configuration table and drawing revision. Request the applicable layout/interface drawing, specification, manual, parts list and agreed inspection or test records. Performance curves or certificates should be linked only when an applicable original exists; a reference summary is not a substitute.

Compare configurations for your project

For Pig Head Hydraulic Shear | HT-P405-I, keep the complete identifier HT-P405-I attached to its own source configuration. Compare process duty, incoming animal or product range, target output, utilities, installation envelope and upstream/downstream interfaces under the same project conditions. A higher catalogue rate alone does not establish a better fit.

Start with this page's listed reference fields: Rated voltage/Phase/Frequency: 380V/3P/50HZ; Power: 3Kw; Blade opening size: 300mm; Capacity: 4sec/ time; Component and material: 1) Balance 2) Hydraulic station 3) Connecting soft pipe. Confirm units, conditions and revision against the quoted configuration; do not transfer values to another model.

Compare alternative quotations only after each supplier identifies the complete model, configuration and matching documents. No universal suffix meaning or unsupported advantage over another model is asserted.

Purchasing review and enquiry preparation

Start with Pig Head Hydraulic Shear | HT-P405-I and its specification/source notes. Download the linked reference summary, then request the original configuration-specific drawing and current technical documents. The summary is not an approved drawing, certificate or acceptance record.

Use the linked pig processing application and purchasing guidance to review process interfaces, selection conditions and the proposed supply boundary. Verify which manufacturer, supplier and installation responsibilities are included; a reference photo does not establish factory ownership, certification or a completed HUATAO installation.

Before enquiry, prepare animal species or incoming product, size/weight range, target throughput, operating shifts, destination, available utilities and a layout or interface drawing. Quote HT-P405-I and identify the missing documents or conditions you need checked. Use the enquiry on this page so the product and original source page are retained.

Source reference configuration 1
ParameterReference Value / Buyer Check
ModelHT-P405-I
ApplicationWhich main used to cut pig head by hydraulic
Rated voltage/Phase/Frequency380V/3P/50HZ
Power3Kw
Blade opening size300mm
Hydraulic pressure220bar
Compressed air pressure6bar
Capacity4sec/ time
Weight37KG
Component and material1) Balance 2) Hydraulic station 3) Connecting soft pipe
Quotation controlConfirm cutting location, carcass range, required cycle rate, hydraulic pressure, hose length, suspension and local safety controls. Order spare blades and a seal kit.

Buyer FAQ

What information is needed to quote the Pig Head Hydraulic Shear?

Confirm cutting location, carcass range, required cycle rate, hydraulic pressure, hose length, suspension and local safety controls. Order spare blades and a seal kit.

Which spare parts should be ordered with the machine?

Start with the normal wear and hygiene parts for this duty: bearings, seals, sensors, chains or belts, nozzles, blades, scrapers, pneumatic parts and electrical protection devices as applicable. The supplier should issue a model-specific list.

Are the published technical figures final?

No. The table records reference information from the citedHTpage. Capacity, power, dimensions, material grade and utilities must be confirmed on the quotation and approved drawing.

How should the equipment be accepted after installation?

Use a documented site-acceptance test covering alignment, guards, emergency stops, interlocks, dry running, representative load, cleaning access, leakage or drainage, operator training and delivery of manuals and spares.

What information is needed to select this equipment?

State incoming product size and temperature, target cut or separation, rate, output specification, interfaces, blade or tool arrangement and guarding requirements. Agree a representative-product trial and the acceptance criteria.

Are these specifications an approved supply commitment?

No. These are source reference details. The quotation must identify the exact configuration, drawing revision, included documents and agreed acceptance criteria.

Related configurations and guidance

Pig processing equipment categories Pig processing process application Check complete model identifiers and suffixes

Reference specification and document status

Download HT-P405-I reference specification and verification checklist

This reference is not an approved manufacturing drawing, inspection report or certificate. Request the configuration-specific documents before purchase.

Applications

Pig processing workflowExplore pig processing by process task, source equipment and project conditions.

Capabilities

Pig processing line planningExplore pig processing by process task, source equipment and project conditions.

Request specifications

Add company or technical details (optional)

Equipment under review: HT-P405-I

Start with what you know. You can send drawings or photographs by email.

Continue your technical review

Pig processing processCompare published equipmentPrepare quotation informationSupplier verification checklistIdentify related replacement parts