SlaughterPro | HUATAOSearch

Manual Pig Stunning Device | HT-P106-I

Manual Pig Stunning Device. Compare animal range, handling method and transfer interfaces; share your requirements for configuration review.

Manual Pig Stunning Device | HT-P106-I — supplied product-directory equipment/process illustration; exact model configuration must be confirmed

Supplied product-directory reference image: equipment family or process context. It is not proof of an exact model, HUATAO installation or certification. Confirm the proposed configuration photograph and drawing before ordering.

Specification notes

ModelHT-P106-I
Out size220X130X340 (LXWXH)
Component and materialStainless steel stunning forceps Stunning generator
Data statusSource reference R1; configuration requires written confirmation

Use and process role

In a pig plant, the Manual Pig Stunning Device serves as a restrained or hand-operated stunning station intended to render pigs insensible before shackling and bleeding. The final build must match the actual product load, room layout and cleaning routine at site. The HT listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.

Structure and working principle

The pig is guided into a controlled position. The selected electrical, mechanical or other approved stunning method is applied using verified settings, and the animal is discharged promptly for sticking within the plant's welfare time limit. Operators need a clear stop-and-recovery routine for a jam, tool change or hygiene break.

Source-listed construction and features

Calm animal entry and controlled positioning

Settings matched to pig size and local rules

Fast access for the bleeding step

Non-slip, washable contact surfaces

Emergency release provision

Recording or verification options where required

Applications and integration

The usual application is small, medium and industrial pig abattoirs operating under an approved animal-welfare procedure. It can be specified for a new line or adapted to a retrofit, provided that the existing supports, working heights, utilities and control signals are measured on site. Plants handling several pig sizes should state the full range rather than quoting only an average.

Selection conditions and project fit

Provide species, full live-weight and size range, required rate, animal handling procedure, operator position, entry/exit interfaces and destination requirements. Safety arrangements and the applicable procedure require project-specific engineering confirmation.

Evidence, configuration and document status

The descriptions and tables below are source-listed reference information, not independently measured results. Confirm material grade, electrical supply, dimensions, duty, guards, controls and delivery scope in the approved quotation and drawing. No model-specific certificate or verified customer installation is established by this page. Request the document issuer, applicable model, scope and revision before relying on a compliance claim.

Source and version

Reference compilation R1, 2026-11-16. Supplied document: 1. 致晕,宰杀,放血 设备 Pig Stunning, Killing and Bleeding Equipment.doc; section 1.25. Configuration rows retain source units. Where the source lists alternatives or several models, each row must be checked as a separate configuration; a capacity or dimension must not be transferred between models.

Installation and process interfaces

Provide the full animal weight/size range, approach and exit route, operator position and the interface to the receiving rail or conveyor. Allow access for the proposed guarding and maintenance arrangement.

Utilities, control and feedback requirements

Confirm the proposed electrical, pneumatic or hydraulic arrangement from the matching model table. Agree control positions, emergency stopping and interlocks with the responsible engineering team; do not assume a universal slaughter procedure or approval.

Maintenance and part identification

Request the configuration-specific manual and part references for restraint components, drive parts, hoses and controls where fitted. Agree quantities and replenishment needs against actual duty and delivery experience. This page does not prescribe maintenance intervals, repairs or a guaranteed stock position.

Configuration-specific document checklist

Before purchase, identify the complete model and suffix, configuration table and drawing revision. Request the applicable layout/interface drawing, specification, manual, parts list and agreed inspection or test records. Performance curves or certificates should be linked only when an applicable original exists; a reference summary is not a substitute.

Source-unit confirmation required

The supplied reference does not explicitly state a unit for these fields: Out size. The original entries are retained rather than assigning an assumed unit. Confirm the units, matching configuration and operating conditions before comparing these figures or approving a quotation.

Compare configurations for your project

For Manual Pig Stunning Device | HT-P106-I, keep the complete identifier HT-P106-I attached to its own source configuration. Compare process duty, incoming animal or product range, target output, utilities, installation envelope and upstream/downstream interfaces under the same project conditions. A higher catalogue rate alone does not establish a better fit.

Start with this page's listed reference fields: Out size: 220X130X340 (LXWXH); Component and material: Stainless steel stunning forceps Stunning generator. Confirm units, conditions and revision against the quoted configuration; do not transfer values to another model.

Compare alternative quotations only after each supplier identifies the complete model, configuration and matching documents. No universal suffix meaning or unsupported advantage over another model is asserted.

Purchasing review and enquiry preparation

Start with Manual Pig Stunning Device | HT-P106-I and its specification/source notes. Download the linked reference summary, then request the original configuration-specific drawing and current technical documents. The summary is not an approved drawing, certificate or acceptance record.

Use the linked pig processing application and purchasing guidance to review process interfaces, selection conditions and the proposed supply boundary. Verify which manufacturer, supplier and installation responsibilities are included; a reference photo does not establish factory ownership, certification or a completed HUATAO installation.

Before enquiry, prepare animal species or incoming product, size/weight range, target throughput, operating shifts, destination, available utilities and a layout or interface drawing. Quote HT-P106-I and identify the missing documents or conditions you need checked. Use the enquiry on this page so the product and original source page are retained.

Source reference configuration 1
ParameterReference Value / Buyer Check
ModelHT-P106-I
ApplicationWhich main used for small size abattoir pig stunning or combination with straddle-type conveyor stun machine
Electric current0.5-1.2A
Stunning time1~5s
Out size220X130X340 (LXWXH)
Component and materialStainless steel stunning forceps Stunning generator
Quotation controlThe buyer must state the approved stunning method, pig weight range, throughput, restraint layout, local welfare standard, backup procedure and electrical supply. Final settings require competent veterinary validation.

Buyer FAQ

What information is needed to quote the Manual Pig Stunning Device?

The buyer must state the approved stunning method, pig weight range, throughput, restraint layout, local welfare standard, backup procedure and electrical supply. Final settings require competent veterinary validation.

Which spare parts should be ordered with the machine?

Start with the normal wear and hygiene parts for this duty: bearings, seals, sensors, chains or belts, nozzles, blades, scrapers, pneumatic parts and electrical protection devices as applicable. The supplier should issue a model-specific list.

Are the published technical figures final?

No. The table records reference information from the citedHTpage. Capacity, power, dimensions, material grade and utilities must be confirmed on the quotation and approved drawing.

How should the equipment be accepted after installation?

Use a documented site-acceptance test covering alignment, guards, emergency stops, interlocks, dry running, representative load, cleaning access, leakage or drainage, operator training and delivery of manuals and spares.

What information is needed to select this equipment?

Provide species, full live-weight and size range, required rate, animal handling procedure, operator position, entry/exit interfaces and destination requirements. Safety arrangements and the applicable procedure require project-specific engineering confirmation.

Are these specifications an approved supply commitment?

No. These are source reference details. The quotation must identify the exact configuration, drawing revision, included documents and agreed acceptance criteria.

Related configurations and guidance

Pig processing equipment categories Pig processing process application Check complete model identifiers and suffixes

Reference specification and document status

Download HT-P106-I reference specification and verification checklist

This reference is not an approved manufacturing drawing, inspection report or certificate. Request the configuration-specific documents before purchase.

Applications

Pig processing workflowExplore pig processing by process task, source equipment and project conditions.

Capabilities

Pig processing line planningExplore pig processing by process task, source equipment and project conditions.

Request specifications

Add company or technical details (optional)

Equipment under review: HT-P106-I

Start with what you know. You can send drawings or photographs by email.

Continue your technical review

Pig processing processCompare published equipmentPrepare quotation informationSupplier verification checklistIdentify related replacement parts