Slaughterhouse Water and Meat Splash Guard Screen | HT-P503
Slaughterhouse Water and Meat Splash Guard Screen. Compare load range, dimensions and process interfaces; share your requirements for configuration review.

Specification notes
| Model | HT-P503 |
|---|---|
| Size | 3500*1550mm(W*H) |
| Component and material | 1)Stainless steel main frame support square tube (50*50*2mm) 2) Stainless steel plate (2mm) |
| Data status | Source reference R1; configuration requires written confirmation |
Use and process role
In a pig plant, the Slaughterhouse Water and Meat Splash Guard Screen serves as a physical hygiene barrier that contains splash and separates a wet or trimming operation from the surrounding work area. The final build must match the actual product load, room layout and cleaning routine at site. The HT listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.
Structure and working principle
The screen is positioned between the source and nearby personnel or equipment. Its smooth panel intercepts water and small product particles, which can then be directed toward a controlled cleaning and drainage area. Operators need a clear stop-and-recovery routine for a jam, tool change or hygiene break.
Source-listed construction and features
Smooth surface with few dirt traps
Size adapted to the splash envelope
Rigid supports
Easy removal or access for cleaning
Rounded exposed edges
Compatibility with nearby drains and guards
Applications and integration
The usual application is washing, trimming and cutting stations where splash control improves housekeeping and operator protection. It can be specified for a new line or adapted to a retrofit, provided that the existing supports, working heights, utilities and control signals are measured on site. Plants handling several pig sizes should state the full range rather than quoting only an average.
Selection conditions and project fit
State product or animal range, required duty and throughput, available space, utilities, connection dimensions and delivery scope. Confirm the configuration and acceptance criteria in writing.
Evidence, configuration and document status
The descriptions and tables below are source-listed reference information, not independently measured results. Confirm material grade, electrical supply, dimensions, duty, guards, controls and delivery scope in the approved quotation and drawing. No model-specific certificate or verified customer installation is established by this page. Request the document issuer, applicable model, scope and revision before relying on a compliance claim.
Source and version
Reference compilation R1, 2026-11-16. Supplied document: 1. 致晕,宰杀,放血 设备 Pig Stunning, Killing and Bleeding Equipment.doc; section 1.9. Configuration rows retain source units. Where the source lists alternatives or several models, each row must be checked as a separate configuration; a capacity or dimension must not be transferred between models.
Installation and process interfaces
Provide the load and product range, travel direction, rail/belt section or mating geometry, working heights, supports and maintenance clearances. Similar appearance is not proof of fit.
Utilities, control and feedback requirements
For powered equipment, confirm the matching drive, supply, control and line signals. For passive components, confirm mechanical interfaces and any requirements of the receiving equipment; no powered or feedback capability should be assumed.
Maintenance and part identification
Request the configuration-specific manual and part references for rollers, chains, hooks, bearings, guides and drive elements where applicable. Agree quantities and replenishment needs against actual duty and delivery experience. This page does not prescribe maintenance intervals, repairs or a guaranteed stock position.
Configuration-specific document checklist
Before purchase, identify the complete model and suffix, configuration table and drawing revision. Request the applicable layout/interface drawing, specification, manual, parts list and agreed inspection or test records. Performance curves or certificates should be linked only when an applicable original exists; a reference summary is not a substitute.
Compare configurations for your project
For Slaughterhouse Water and Meat Splash Guard Screen | HT-P503, keep the complete identifier HT-P503 attached to its own source configuration. Compare process duty, incoming animal or product range, target output, utilities, installation envelope and upstream/downstream interfaces under the same project conditions. A higher catalogue rate alone does not establish a better fit.
Start with this page's listed reference fields: Size: 3500*1550mm(W*H); Component and material: 1)Stainless steel main frame support square tube (50*50*2mm) 2) Stainless steel plate (2mm). Confirm units, conditions and revision against the quoted configuration; do not transfer values to another model.
Compare alternative quotations only after each supplier identifies the complete model, configuration and matching documents. No universal suffix meaning or unsupported advantage over another model is asserted.
Purchasing review and enquiry preparation
Start with Slaughterhouse Water and Meat Splash Guard Screen | HT-P503 and its specification/source notes. Download the linked reference summary, then request the original configuration-specific drawing and current technical documents. The summary is not an approved drawing, certificate or acceptance record.
Use the linked pig processing application and purchasing guidance to review process interfaces, selection conditions and the proposed supply boundary. Verify which manufacturer, supplier and installation responsibilities are included; a reference photo does not establish factory ownership, certification or a completed HUATAO installation.
Before enquiry, prepare animal species or incoming product, size/weight range, target throughput, operating shifts, destination, available utilities and a layout or interface drawing. Quote HT-P503 and identify the missing documents or conditions you need checked. Use the enquiry on this page so the product and original source page are retained.
| Parameter | Reference Value / Buyer Check |
|---|---|
| Model | HT-P503 |
| Application | Which main used to prevent water and minced meat splash |
| Size | 3500*1550mm(W*H) |
| Component and material | 1)Stainless steel main frame support square tube (50*50*2mm) 2) Stainless steel plate (2mm) |
| Quotation control | Confirm screen width, height, mounting side, access opening and the required material or transparency. A sketch of the source machine prevents blind spots. |
Buyer FAQ
What information is needed to quote the Slaughterhouse Water and Meat Splash Guard Screen?
Confirm screen width, height, mounting side, access opening and the required material or transparency. A sketch of the source machine prevents blind spots.
Which spare parts should be ordered with the machine?
Start with the normal wear and hygiene parts for this duty: bearings, seals, sensors, chains or belts, nozzles, blades, scrapers, pneumatic parts and electrical protection devices as applicable. The supplier should issue a model-specific list.
Are the published technical figures final?
No. The table records reference information from the citedHTpage. Capacity, power, dimensions, material grade and utilities must be confirmed on the quotation and approved drawing.
How should the equipment be accepted after installation?
Use a documented site-acceptance test covering alignment, guards, emergency stops, interlocks, dry running, representative load, cleaning access, leakage or drainage, operator training and delivery of manuals and spares.
What information is needed to select this equipment?
State product or animal range, required duty and throughput, available space, utilities, connection dimensions and delivery scope. Confirm the configuration and acceptance criteria in writing.
Are these specifications an approved supply commitment?
No. These are source reference details. The quotation must identify the exact configuration, drawing revision, included documents and agreed acceptance criteria.
Related configurations and guidance
Reference specification and document status
Download HT-P503 reference specification and verification checklist
This reference is not an approved manufacturing drawing, inspection report or certificate. Request the configuration-specific documents before purchase.