SlaughterPro | HUATAOSearch

Manual Pig Carcass Chilling Rail | HT-P117-III

Manual Pig Carcass Chilling Rail. Compare product range, residence time and utility conditions; share your requirements for configuration review.

Manual Pig Carcass Chilling Rail | HT-P117-III — supplied product-directory equipment/process illustration; exact model configuration must be confirmed

Supplied product-directory reference image: equipment family or process context. It is not proof of an exact model, HUATAO installation or certification. Confirm the proposed configuration photograph and drawing before ordering.

Specification notes

ModelHT-P117-III
Component and material1) Hot galvanized or stainless steel 10# double channel steel 2) Hot galvanized or stainless steel 10# I-Beam 3) Hot galvanized or stainless steel refined steel casting hanger 4) Connecting bolt 5) φ60*4mm 304 stainless steel tube rail (Rube rail) 6) 40X40X4mm 304stainless steel dual rail (Dual orbit)
Data statusSource reference R1; configuration requires written confirmation

Use and process role

In a pig plant, the Manual Pig Carcass Chilling Rail serves as a manual overhead rail section for moving dressed pig carcasses through chilling, storage or dispatch. The final build must match the actual product load, room layout and cleaning routine at site. The HT listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.

Structure and working principle

Trolleys roll along the supported rail under manual push or gravity. Switches, stops and gradients guide each carcass into the selected room or onward route while maintaining hanging separation. Operators need a clear stop-and-recovery routine for a jam, tool change or hygiene break.

Source-listed construction and features

Rail load and support spacing engineered for the duty

Smooth trolley travel

Switches and stops for route control

Corrosion-resistant finish options

Cleaning clearance around the track

Expandable room layout

Applications and integration

The usual application is pig chill rooms, equalization storage, small cutting plants and dispatch areas. It can be specified for a new line or adapted to a retrofit, provided that the existing supports, working heights, utilities and control signals are measured on site. Plants handling several pig sizes should state the full range rather than quoting only an average.

Selection conditions and project fit

Provide rail or belt dimensions, working height, travel direction, carrier spacing, load range, speed and upstream/downstream connection drawings. A similar-looking carrier is not proof of fit.

Evidence, configuration and document status

The descriptions and tables below are source-listed reference information, not independently measured results. Confirm material grade, electrical supply, dimensions, duty, guards, controls and delivery scope in the approved quotation and drawing. No model-specific certificate or verified customer installation is established by this page. Request the document issuer, applicable model, scope and revision before relying on a compliance claim.

Source and version

Reference compilation R1, 2026-11-16. Supplied document: 3. 冷却,切割,包装输送设备.doc; section 3.1. Configuration rows retain source units. Where the source lists alternatives or several models, each row must be checked as a separate configuration; a capacity or dimension must not be transferred between models.

Installation and process interfaces

State incoming product condition, process residence time, line speed, working height, water connections, drain location and access for cleaning or component removal. Check the full installation envelope, not only catalogue dimensions.

Utilities, control and feedback requirements

Use only the power, water, heating or cooling values given for the matching source configuration. Confirm operating pressure/flow or temperature, control method and line signals. A reference machine does not establish a validated hygiene or cooling result.

Maintenance and part identification

Request the configuration-specific manual and part references for nozzles, seals, pumps, sensors, conveying elements and any heating/cooling components fitted. Agree quantities and replenishment needs against actual duty and delivery experience. This page does not prescribe maintenance intervals, repairs or a guaranteed stock position.

Configuration-specific document checklist

Before purchase, identify the complete model and suffix, configuration table and drawing revision. Request the applicable layout/interface drawing, specification, manual, parts list and agreed inspection or test records. Performance curves or certificates should be linked only when an applicable original exists; a reference summary is not a substitute.

Compare configurations for your project

For Manual Pig Carcass Chilling Rail | HT-P117-III, keep the complete identifier HT-P117-III attached to its own source configuration. Compare process duty, incoming animal or product range, target output, utilities, installation envelope and upstream/downstream interfaces under the same project conditions. A higher catalogue rate alone does not establish a better fit.

Start with this page's listed reference fields: Component and material: 1) Hot galvanized or stainless steel 10# double channel steel 2) Hot galvanized or stainless steel 10# I-Beam 3) Hot galvanized or stainless steel refined steel casting hanger 4) Connecting bolt 5) φ60*4mm 304 stainless steel tube rail (Rube rail) 6) 40X40X4mm 304stainless steel dual rail (Dual orbit). Confirm units, conditions and revision against the quoted configuration; do not transfer values to another model.

Compare alternative quotations only after each supplier identifies the complete model, configuration and matching documents. No universal suffix meaning or unsupported advantage over another model is asserted.

Purchasing review and enquiry preparation

Start with Manual Pig Carcass Chilling Rail | HT-P117-III and its specification/source notes. Download the linked reference summary, then request the original configuration-specific drawing and current technical documents. The summary is not an approved drawing, certificate or acceptance record.

Use the linked pig processing application and purchasing guidance to review process interfaces, selection conditions and the proposed supply boundary. Verify which manufacturer, supplier and installation responsibilities are included; a reference photo does not establish factory ownership, certification or a completed HUATAO installation.

Before enquiry, prepare animal species or incoming product, size/weight range, target throughput, operating shifts, destination, available utilities and a layout or interface drawing. Quote HT-P117-III and identify the missing documents or conditions you need checked. Use the enquiry on this page so the product and original source page are retained.

Source reference configuration 1
ParameterReference Value / Buyer Check
ModelHT-P117-III
ApplicationWhich main used to hang pig carcass for bleeding, evisceration, chilling, boneless and so on
Rail Height2700-3300m
Push block distance600-800mm
Component and material1) Hot galvanized or stainless steel 10# double channel steel 2) Hot galvanized or stainless steel 10# I-Beam 3) Hot galvanized or stainless steel refined steel casting hanger 4) Connecting bolt 5) φ60*4mm 304 stainless steel tube rail (Rube rail) 6) 40X40X4mm 304stainless steel dual rail (Dual orbit)
Quotation controlProvide room layout, rail height, carcass load, trolley drawing, required spacing, support steel and door locations. Refrigeration duty is a separate project calculation.

Buyer FAQ

What information is needed to quote the Manual Pig Carcass Chilling Rail?

Provide room layout, rail height, carcass load, trolley drawing, required spacing, support steel and door locations. Refrigeration duty is a separate project calculation.

Which spare parts should be ordered with the machine?

Start with the normal wear and hygiene parts for this duty: bearings, seals, sensors, chains or belts, nozzles, blades, scrapers, pneumatic parts and electrical protection devices as applicable. The supplier should issue a model-specific list.

Are the published technical figures final?

No. The table records reference information from the citedHTpage. Capacity, power, dimensions, material grade and utilities must be confirmed on the quotation and approved drawing.

How should the equipment be accepted after installation?

Use a documented site-acceptance test covering alignment, guards, emergency stops, interlocks, dry running, representative load, cleaning access, leakage or drainage, operator training and delivery of manuals and spares.

What information is needed to select this equipment?

Provide rail or belt dimensions, working height, travel direction, carrier spacing, load range, speed and upstream/downstream connection drawings. A similar-looking carrier is not proof of fit.

Are these specifications an approved supply commitment?

No. These are source reference details. The quotation must identify the exact configuration, drawing revision, included documents and agreed acceptance criteria.

Related configurations and guidance

Pig processing equipment categories Pig processing process application Check complete model identifiers and suffixes

Reference specification and document status

Download HT-P117-III reference specification and verification checklist

This reference is not an approved manufacturing drawing, inspection report or certificate. Request the configuration-specific documents before purchase.

Applications

Pig processing workflowExplore pig processing by process task, source equipment and project conditions.

Capabilities

Pig processing line planningExplore pig processing by process task, source equipment and project conditions.

Request specifications

Add company or technical details (optional)

Equipment under review: HT-P117-III

Start with what you know. You can send drawings or photographs by email.

Continue your technical review

Pig processing processCompare published equipmentPrepare quotation informationSupplier verification checklistIdentify related replacement parts