Request a water-demand schedule for the proposed equipment and its relevant operating states. A total consumption estimate does not tell the site designer what connection conditions or simultaneous demands the installation must accommodate.
Confirm whether the contracted pork product retains the skin before comparing a dehairing route with a skin-removal route. The required saleable product is a process input, not a detail to resolve after choosing machinery. Hair removal and skin removal should not be treated as equivalent deliverables in an enquiry.