Which reference is being used?

WOAH's 2024 slaughter-welfare chapter identifies species, category, quantity, size or weight and age as equipment-choice considerations. This article references that edition, not a claim about current local law or a certified machine. WOAH 2024 chapter, Article 7.5.8
Record observed inputs separately from assumptions about future livestock. Ask the project's responsible veterinary and engineering specialists what additional characteristics matter to the suitability review. Do not convert the checklist into handling instructions or operating settings.
What should a supplier answer?
Request the proposed configuration and the animal profile it is intended to cover. Ask which categories or conditions are excluded and which remain subject to assessment. A broad species claim should not silently become confirmation for every animal in the buyer's supply.
Keep catalogue descriptions attached to the actual drawing and configuration. Where alternative equipment is offered, require the supplier to identify the difference in applicable inputs and the evidence supporting its proposal.
What should the review record retain?
Keep the approved input description, supplier response and unresolved specialist questions together. If the expected livestock mix changes, have the responsible team revisit suitability rather than assuming the original confirmation still applies.
This guide establishes no HUATAO animal-range approval, welfare certification or restraint performance. It provides procurement information questions and no positioning, restraint or stunning technique.
Buyer's next step: Complete an animal-input schedule and ask the supplier to mark every category as addressed, excluded or awaiting technical review against the proposed configuration.
| Field | Buyer question |
|---|---|
| Animal input | Document the project profile: which animal categories are involved? Icons are illustrative, not a compatibility claim. |
| Configuration | Identify the proposed configuration for this project and the evidence supporting its applicable inputs. |
| Exclusions | Record categories and conditions excluded or awaiting assessment. |
| Specialist review | Identify the information needed for responsible veterinary and engineering specialists to review project suitability; revisit the review when expected inputs change. |